Equipment List:
- Absorber Set
- Storage Box
- Needed Absorbers (Letter: Element - Thickness)
- A: Al Foil - 0.7 mil
- B: Al Foil - 1 mil
- C: Poly - 4 mil
- D: Poly - 8 mil
- E: Plastic - 0.030
- F: Plastic - 0.040
- K: Al - 0.050
- L: Al - 0.063
- M: Al - 0.080
- N: Al - 0.090
- O: Al - 0.100
- P: Al - 0.125
- Q: Pb - 0.032
- R: Pb - 0.064
- S: Pb - 0.125
- T: Pb - 0.250
- Uneeded Absorbers (Letter: Element - Thickness)
- G: Al - 0.020
- H: Al - 0.025
- I: Al - 0.032
- J: Al - 0.040
- Isotopes
- 90Sr (strontium - 90)
- 204Tl (Thallium - 204)
- 137Cs (Cesium - 137)
- Detector and Counter
- ST360 Counter
- BNC to BNC Cable
- Guiger-Müller (GM) tube (only one output)
- GM tube support and shelves
- Plastic source holder
- USB A to B Cord
- Barium Generator Set up at the TA station:
- Barium Source
- Eluting Solution
- Syringe
- 1 Planchet per table per section needed, but kept at the TA station
- Gloves
- Paper Towels
General Class Use:
- Human readable name in case of failure another item
Notes and tests:
- Plug the USB cord into the computer and the back of the ST360 Counter
- Plug the BNC Cable into the Guiger-Müller (GM) port (HAVE HENRY DOUBLE CHECK THIS) on the back of the ST360 counter and into the top of the GM tube.
- Turn on the ST360
- Open STX on the computer
- In the Setup menu select HV Setting then:
- set the High Voltage to 700
- set the Step Voltage to 20
- set the Enable Step Voltage to On
- In the Preset Menu:
- select Time then select 10
- select Pause Time then type 0
- select Number of Runs then type 25
- Click start (Green Diamond) and watch for the numbers to rise then plateau.
- Once the numbers start rising again, click stop.

![[PREV]](http://www1.phys.vt.edu/~demo/images/Mis/arrownew.gif)